+91 96741 60623 muraryjha@gmail.com Mon - Sat: 9:00 AM - 6:00 PM
Follow Us:

KAVACH (TCAS) Solutions

Kavach TCAS System

Enhancing the safety of Indian Railways with KAVACH, the indigenous Train Collision Avoidance System (TCAS) designed to prevent accidents and ensure high-speed transit.

Param Enterprises Private Limited is at the forefront of implementing the turnkey execution, supply, installation, testing, and commissioning of the KAVACH (TCAS) network. This system automatically applies brakes to loco in case the loco pilot fails to act timely and also prevents Signal Passed at Danger situation (SPAD) and head-on collisions.

System Implementation Architecture

Station TCAS Integration
Loco TCAS Fitment
Tower & UHF Radio Network Setup
Track RFID Tag Placement

Core Advantages of KAVACH

Collision Prevention Mechanism

Helps prevent side, rear-end, and head-on collisions by continuously monitoring train locations and automatically applying brakes in emergency situations when required.

Continuous Speed Monitoring

Continuously monitors train speed, alerts the loco pilot when the train exceeds the permitted speed, and automatically applies the brakes when necessary, especially while entering lower-speed zones.

Our Technology Partners

We collaborate with leading technology provider for KAVACH solutions — MEDHA, to integrate best-in-class, RDSO-certified systems into our comprehensive safety solutions.

Medha Servo Drives Partnership

Direct integration of Medha Station TCAS units, Loco TCAS apparatus, and certified SIL-4 collision avoidance modules.

KAVACH Process Workflow Visualization

1
Survey

Foot Survey, Drone Survey, LiDAR Survey, and Soil Testing across tracks and station yards.

2
Planning

Station TCAS Arrangement, Loco TCAS Arrangement, RFID Tag Arrangement, Tower & its Equipment Installation.

3
Civil Work & Other Connectivity

Cable Trenching & Laying, Tower Installation, Physical Connectivity with Station, Loco, Tower and Track Devices.

4
Execution & Testing

Integrated Testing with KAVACH Systems and EI Operator, Testing with Loco Equipment, Simulation Test, Commissioning.

Related Projects

Work in Progress at various sites

Work in Progress

ECR – Dhanbad Div-KAVACH Work (502 kms)

Turnkey execution, supply, installation, testing and commissioning across Dhanbad Division.

Work in Progress

ECR – KAVACH Work (607 kms)

Turnkey deployment and radio network setup across 607 kms of East Central Railway.

Work in Progress

WCR – Jabalpur Div-KAVACH Work (1198 kms)

Comprehensive TCAS network, RFID tag placement, and loco fitment across 1198 kms.

Implement KAVACH with Param

Reach out to us to rapidly deploy KAVACH ATP systems safely onto domestic railway lines and enhance transit safety.